Protective Industrial Polymers
Talk to an engineer
ESD · Static-Control Flooring

Static-dissipative and conductive floors, specified to pass the audit.

Conductive or dissipative is a resistance target, not a product. We map it to how your facility actually runs, document every decision, and stay at the table from first audit to final cure.

ANSI/ESD S20.20 ESD TR53 validated Semiconductor · Data center · Battery Decorative ESD capable
Trusted in the field

Specified into production floors at facilities operated by industry leaders.

PIP ESD systems are installed through our contractor network into sites run by companies like these, across semiconductor, aerospace and defense, pharma, and advanced manufacturing.

AIA CEU #630685
Performance-Based Specification Methodology
8 in-house TR53 auditors
More than the billion-dollar competitors
ANSI ESD S20.20 compliant
Documented per ESD TR53 program
Industrial-only since 2008
No residential. No retail. Just facilities.
Why specification beats a data sheet

ESD compliance is one requirement. Real performance is dozens of decisions.

Most floors get picked from a product sheet. We design a documented system across five specification categories, before you go to bid, so the floor still passes when the auditor walks the line in year three. Conductive, static-dissipative, decorative when you need it. The specialization of independent, with the convenience of turn-key.

Recent work

Documented ESD systems, installed through our contractor network.

Expansive ESD-controlled polymer floor across an electronics manufacturing facility
Close detail of the static-dissipative polymer floor finish
Seamless ESD floor system meeting the facility wall line

Electronics manufacturing facility, Wisconsin. ANSI/ESD S20.20 polymer system. More project imagery coming soon.

30 minutes. No pitch.

Bring your project. Or your spec.

Have a spec? In 30 minutes we pressure-test it against the five categories before you go to bid. Don't have one yet? We map what your facility needs and you walk out with the considerations that matter, plus the AIA CEU + PSR template.

No pitch. You make the decision. We document the logic behind it.

1 Tell us about your facility
2 Pick a time that works
Step 1 of 2

Tell us about your facility

30 min · TR53-credentialed engineer · No sales
Not ready to talk?

Get the ESD spec guide.

The floating-floor myth, and how ESD floors actually pass an audit. Written by Patrick Scudder, SH&A-certified ESD plant auditor. No call required.

Free PDF · instant download